A Ellery company - serving Westchester, CA
New Detached ADU in Venice, CA | Ellery ADU Studio Westchester

New Detached ADU in Venice - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

20+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Venice

A new detached ADU in Venice typically runs $320,000-$580,000 all-in, from permit set through final inspection, with Coastal Development Permit timelines adding 60-120 days to standard LADBS review. We’re Ellery ADU Studio Westchester, and our New Detached ADU team has designed, permitted, and built across Venice’s narrow lots and coastal zones since 2015. Dispatch and scheduling are coordinated from our Los Angeles office, but our crews work Venice locally - from the Venice Canals to Oakwood to the area near Abbot Kinney Boulevard. Call (213) 698-7591 to schedule your free estimate. Written price before any work starts, per Haven Standard Clause 1.

Call (213) 698-7591

Why Ellery ADU Studio Westchester Is Venice’s Preferred New Detached ADU Company

We’ve completed detached ADUs on Venice’s 25-foot-wide lots, on canal-adjacent fill land off Dell Avenue, and in the Oakwood neighborhood where rear alleys date back to the 1920s. Our clients in Venice receive the same documentation package as every Ellery project: a permit set approved by LADBS, a Coastal Development Permit when required, a written price locked at signing, and a photo record from every site visit.

Our crews understand that Venice isn’t Culver City or Mar Vista. The California Coastal Commission’s jurisdiction covers a large share of Venice parcels, and their staff apply Local Coastal Program provisions that inland contractors rarely encounter. We’ve navigated enough of these dual-approval projects that we run the CDP and LADBS permits in parallel, not sequentially. That scheduling discipline alone has saved our Venice clients months.

Response time to Venice is same-week for initial site visits. A live person answers calls 24/7, and we offer a Free Second Opinion on any written estimate already in hand.

Our New Detached ADU Services in Venice

construction workers installing wood wall frame for new detached ADU project
Our New Detached ADU Services in Venice

Custom Built ADU

Custom built ADUs in Venice start around $380,000 and often reach $580,000 for two-bedroom units on challenging lots. The narrow 25-to-40-foot plats that Abbot Kinney laid out in 1905 constrain footprint and placement, so every custom design here starts with a measured survey of actual setbacks, not standard assumptions. On canal-adjacent properties, we design to the Venice Canal Historic District’s view-corridor requirements from the start, not as a redesign after first submittal. Our permit set includes the LADBS drawings and the Coastal Development Permit package as one deliverable, under a single contract at a single written price.

Custom Built ADU

Prefab ADU Installation

Prefab ADU installation in Venice runs $320,000-$480,000 depending on foundation complexity and unit specification. We’ve coordinated Plant Prefab and Mighty Buildings units onto Venice lots where crane access is tight and the marine layer demands hot-dip-galvanized hardware and sealed building envelopes. The foundation is where prefab projects in Venice often surprise out-of-area contractors: canal-area fill land and high groundwater mean a soils report that frequently recommends helical piers or a post-tension slab, not a standard spread footing. We price that foundation work upfront, not as a change order after the soils report lands. Haven Standard Clause 5 - No Surprises.

Prefab ADU Installation

Modular ADU

Modular ADUs in Venice typically fall between $340,000 and $500,000 all-in. Boxabl and Dvele systems both specify well for coastal conditions when you select the right cladding, fastener, and sealant packages. Our role is specifying those packages correctly for Venice’s salt-laden onshore air, then coordinating factory delivery with site readiness. The modular path compresses construction duration, but it doesn’t compress permitting - the Coastal Development Permit timeline remains the critical path. We file both permit tracks simultaneously.

Modular ADU

Studio ADU & 1-Bed & 2-Bed ADU

Studio ADUs in Venice start near $320,000; 1-bed units typically run $360,000-$450,000; 2-bed configurations range $420,000-$580,000 depending on foundation and envelope specification. The 1-bed and 2-bed ADU formats are what most Venice homeowners need for rental income or family use, but the lot width often dictates a vertical solution - second story over ground-floor parking - that triggers additional height and bulk restrictions under the Local Coastal Program. We model those restrictions in the first design meeting, not after permit submittal.

Studio ADU & 1-Bed & 2-Bed ADU
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (213) 698-7591

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Venice

We specify and coordinate prefab and modular systems from Mighty Buildings, Boxabl, and Plant Prefab within the same single contract that covers your design, permitting, and site work. For Venice’s marine-layer conditions, we specify hot-dip-galvanized exterior fasteners, sealed electrical panels rated for NEMA 3R or better, and HVAC condensers with enhanced coil protection - upgrades that standard inland specifications skip. Our relationships with these manufacturers mean we can confirm lead times and coastal-spec availability before your written price is finalized, not after.

Common New Detached ADU Problems We See in Venice Homes

Contractors installing trim on a newly constructed detached ADU exterior.
Common New Detached ADU Problems We See in Venice Homes
  • Missing the Coastal Development Permit entirely. A generalist contractor files only with LADBS, then stalls for months when coastal jurisdiction is flagged during plan review. We identify CDP requirement in the first site visit and file both tracks together.
  • Reusing 1920s-1940s garage footings on canal-area fill. The rubble-stone or shallow spread footings beneath old Venice garages won’t carry a new detached ADU, and soils reports on fill land routinely recommend helical piers or post-tension slabs. We price foundation replacement upfront.
  • Inland-grade exterior products specified for coastal air. Standard fasteners, panels, and HVAC equipment corrode and fail early under Venice’s year-round salt-laden humidity. We specify marine-grade alternatives and document the specification in your permit set.
  • Designing without Local Coastal Program view corridors in mind. A detached ADU visible from Venice Canal walkways can face design-review rejection for bulk, height, or materials. We pull the Local Coastal Program map in the first meeting and design to it.
Get the price in writing before anything starts.Serving Venice - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Venice, CA

A new detached ADU in Venice runs $320,000-$580,000 all-in, with the lower end representing a studio prefab unit on straightforward soil and the upper end a two-bedroom custom build on canal-adjacent fill requiring post-tension foundation and full Coastal Development Permit. Foundation work adds $35,000-$85,000 when helical piers or post-tension slabs are required. The Coastal Development Permit itself carries city and CCC fees, plus the architectural drawings needed for coastal review. Every Ellery quote is a written price before any work starts - Haven Standard Clause 1 - with line-item breakdown of foundation, envelope, permit fees, and construction. No change orders for items we should have caught. Call (213) 698-7591 for your free estimate.

We Also Serve Cities Near Venice

Architect designing an accessory dwelling unit floor plan on grid paper.
We Also Serve Cities Near Venice

Our New Detached ADU in Venice crews also work in Santa Monica, Culver City, Beverly Hills, and Inglewood. Each city has its own permit timeline and coastal or non-coastal status, and we adjust our filing strategy accordingly. Santa Monica mirrors Venice’s CCC jurisdiction; Culver City and Beverly Hills do not.

Serving Venice, CA - Our Local Coverage Area

We’re based in the Venice area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Venice

Two construction workers installing exterior trim on a modern detached ADU.
FAQs - New Detached ADU in Venice

What Venice Customers Say

Trusted by homeowners across Venice and surrounding areas.

★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer

Why Venice Chooses Ellery ADU Studio Westchester

We set the standard for new detached adu in Venice.

Fast Turnaround in Westchester

Our streamlined design and permitting workflow means your Westchester ADU project moves from signed contract to permit approval faster than the regional average - without sacrificing quality or compliance.

Designed for Westchester Lots

We understand Westchester's specific lot sizes, setback requirements, and neighborhood aesthetic. Every ADU we design is optimized for your exact property and the city's current code.

Accountable From Start to Finish

Your project has a dedicated point of contact who lives and works in this community. We show up, communicate clearly, and stand behind every ADU we build in Westchester.

How It Works in Venice

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Venice - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Ready for New Detached ADU in Venice?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Venice.

(213) 698-7591

Request a Free Estimate in Venice

Tell us about your new detached adu needs - we'll respond within the hour.

By reaching out through this form, you confirm you have read our Privacy Policy and agree that you may be contacted via phone, email, or SMS about your service request, including from the local pros who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - Fast Dispatch