A Ellery company - serving Westchester, CA
A quiet residential street with a new ADU behind one of the homes
Studio City, CA

ADU Design & Permitting in Studio City - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Westchester
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new two-story ADU over a garage
An attached garage converted into living space
The private side entrance of a junior ADU
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
A new modern ADU with wood cladding
A new bathroom inside a converted garage
The bedroom inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU in Studio City, CA

A Junior ADU or interior conversion in Studio City typically runs $85,000-$175,000 all-in, while site prep and utility upgrades add $15,000-$65,000 depending on whether your parcel sits on the flatland near Ventura Boulevard or the hillside streets climbing toward Mulholland. We’re Ellery ADU Studio, and we’ve found that Studio City’s post-WWII housing stock, its VHFHSZ fire-zone overlay, and its punishing summer heat create a specific set of constraints that flatland Valley contractors often underestimate. Call (213) 698-7591 and we’ll schedule your free estimate with a written price before any work starts.

Call (213) 698-7591

Why Studio City Homes Are Different

Studio City’s residential fabric is mostly California ranch and Spanish Colonial Revival homes built from the mid-1940s through the late 1960s, sitting on 7,000-10,000 sq ft lots that look generous until you discover the 100-amp electrical panels, galvanized water lines, and single-car garages underneath. The south-facing Santa Monica Mountains slope traps heat; summer highs here routinely top 100°F, meaningfully hotter than Burbank or the Westside, so every ADU we design specifies ductless mini-split cooling from the start.

The bigger variable is terrain. Parcels on hillside streets near Fryman Canyon fall within the City’s Very High Fire Hazard Severity Zone, requiring Class A roofing, ember-resistant vents, and fire-rated exterior cladding that flatland neighborhoods skip entirely. Crane and materials-hoist permits for steep grades add weeks and thousands before framing begins. These aren’t edge cases; they’re standard conditions on the north side of Ventura Boulevard that reshape both timeline and budget.

Our Main Studio City Services

Studio City homeowners typically start with one of these three project types, each with its own permit path and cost structure:

ADU Design & Permitting in Studio City

We produce the full permit set, Title 24 energy calculations, and LADBS plan-check submittal as a standalone deliverable or as the first phase of a build contract. For hillside parcels in the VHFHSZ, our drawings include ignition-resistant detailing from day one so plan check doesn’t stall on fire-code revisions. ADU Design & Permitting in Studio City covers both detached and conversion projects under one fee.

ADU Design & Permitting in Studio City

Garage Conversion ADU in Studio City

Studio City’s single-car detached garages are common JADU candidates, but most need slab reinforcement, electrical service upgrades, and sometimes fire-separation walls to the main house. We assess the existing structure before quoting so the price you sign reflects actual conditions, not a best-case assumption. Garage Conversion ADU in Studio City includes all three trades in one contract.

Garage Conversion ADU in Studio City

New Detached ADU in Studio City

Flatland lots south of Ventura can accommodate a full 1,200 sq ft detached unit, while hillside parcels may be limited by setback and access constraints. We coordinate prefab systems from Abodu, Plant Prefab, and Tuff Shed when site access allows, or stick-build when crane staging isn’t practical. New Detached ADU in Studio City is priced as design-build from the first meeting.

New Detached ADU in Studio City
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (213) 698-7591

Junior ADU & Interior Conversion in Studio City

An efficiency kitchen in a junior ADU

Studio City’s 1940s-1960s housing stock presents a specific opportunity: these homes often have underutilized basements, attached rooms, or garage-adjacent spaces that convert to Junior ADUs faster and cheaper than new detached construction, provided the electrical and plumbing can be tapped without a full service upgrade. For homeowners who bought between 2015 and 2025 and want rental income without a six-figure new build, Junior ADU & Interior Conversion is usually the right first move. The 500 sq ft cap and owner-occupancy requirement are constraints, but the reduced parking mandate and streamlined ministerial approval in LA keep timelines shorter than full ADUs.

Room-to-ADU Conversion

Signs you need it

An attached bedroom or den sits unused, the home has separate exterior access already, and the main panel has 30 amps of spare capacity.

What it costs in Studio City

Room-to-ADU conversions in Studio City typically run $85,000-$140,000 all-in, including the permit set, fire separation, kitchenette rough-in, and final inspection.

How we do it

We measure existing conditions, produce the LADBS permit set with Title 24 compliance for the Valley heat load, install fire-rated drywall and self-closing doors between units, rough in the kitchenette and bath, and manage inspections to final.

Interior JADU

Signs you need it

You need rental income within a tighter budget, the main residence will remain owner-occupied, and the proposed space shares at least one wall with the existing home.

What it costs in Studio City

Interior JADUs in Studio City typically run $75,000-$125,000 all-in, with the lower end reflecting spaces that need minimal structural change and no panel upgrade.

How we do it

We verify the 500 sq ft maximum, design the kitchenette and bath layout to code minimums, run dedicated electrical and plumbing from existing mains where capacity allows, and deliver a documented photo record at each inspection phase.

What Junior ADU & Interior Conversion Costs in Studio City

Item Typical range in Studio City
Room-to-ADU conversion (all-in) $85,000 - $140,000
Interior JADU (all-in) $75,000 - $125,000
Electrical panel upgrade (if needed) $4,500 - $8,500

Does a Junior ADU need its own meter in Studio City?

No, LA allows JADUs to share electrical and water service with the main residence, though separate sub-meters are recommended for landlord-tenant clarity. Call (213) 698-7591 and we’ll review your existing service capacity during the free estimate.

Can I convert any room in my Studio City house?

Only attached spaces with separate exterior access and adequate ceiling height qualify; detached rooms need full ADU permitting instead. We’ll verify code compliance and produce the permit set if the space works.

ADU Site Prep & Utilities in Studio City

A utility trench with new sewer pipe and conduit

Most Studio City ADU projects stall not at design, but at the utility connection: 100-amp panels, galvanized laterals, and hillside sewer grades that don’t meet modern fall requirements. For homeowners weighing whether their property can even support an ADU, ADU Site Prep & Utilities answers that question with a written scope and price before excavation starts. The hot Valley climate also pushes cooling loads higher than coastal LA, so our Title 24 calculations account for actual Studio City degree-days, not a citywide average.

Electrical Panel Upgrade

Signs you need it

Your main panel is rated 100 amps, has no spare breaker slots, or shows corrosion from decades of Valley heat cycling.

What it costs in Studio City

Electrical panel upgrades in Studio City typically run $4,500-$8,500, including the new 200-amp service, grounding, and LADBS inspection.

How we do it

We coordinate with LADWP for service release, install the new panel with AFCI protection as required, and tie the ADU sub-panel back to a dedicated breaker before rough inspection.

Plumbing Lateral

Signs you need it

Your home has galvanized supply lines, the sewer cleanout is original cast iron, or the hillside grade produces slow drains that suggest inadequate fall.

What it costs in Studio City

Plumbing lateral replacement in Studio City typically runs $8,500-$18,000, trenching included, with hillside rock conditions at the upper end.

How we do it

We expose the existing lateral with minimal hardscape disruption, replace with ABS sewer and copper or PEX supply to code depth, and pressure-test before backfill and inspection.

What ADU Site Prep & Utilities Costs in Studio City

Item Typical range in Studio City
Electrical panel upgrade $4,500 - $8,500
Plumbing lateral replacement $8,500 - $18,000
Foundation and grading (hillside) $15,000 - $35,000

Will LADWP require a new service drop for my Studio City ADU?

Usually yes if the existing service is 100 amps; we handle the LADWP coordination and inspection scheduling as part of the panel upgrade scope. Call (213) 698-7591 for a written quote on your specific service size.

How long does utility work take before ADU construction starts?

Panel upgrades and lateral work typically need 4-6 weeks including LADWP or LADBS inspection lead time; hillside permits add 1-2 weeks. We sequence this work so construction begins the day after final utility inspection.

Brands We Service in Studio City

We specify and coordinate prefab and modular systems from Plant Prefab, Tuff Shed, and James Hardie within the same single-contract design-build model, with local stocking for common siding and roofing materials that keeps change orders off the table. our brands

Pricing for ADU in Studio City, CA

Service Typical range in Studio City
Interior JADU (all-in) $75,000 - $125,000
Room-to-ADU conversion (all-in) $85,000 - $140,000
Electrical panel upgrade $4,500 - $8,500
Plumbing lateral replacement $8,500 - $18,000
Foundation and grading (hillside) $15,000 - $35,000
Garage conversion ADU (all-in) $110,000 - $195,000
New detached ADU (all-in) $220,000 - $380,000
ADU design and permitting (standalone) $12,000 - $22,000

VHFHSZ fire-resistant materials, crane permits for hillside access, and Title 24 cooling loads for the Valley microclimate push Studio City projects toward the upper end of each range. Every figure above is paired with Haven Standard Clause 1: a written, line-item price before any work begins, with no change orders unless you change the scope.

Neighborhoods We Serve in Studio City

We work across Studio City’s full residential footprint, from the flatland blocks south of Ventura Boulevard to the hillside streets climbing toward Mulholland. Crews are scheduled from the Los Angeles area with typical first-site arrival within the metro response window.

  • Fryman Canyon
  • Colfax Meadows
  • Longridge Estates
  • Silver Triangle
  • Studio City Hills

Service Area - Cities Near Studio City

Ellery ADU Studio serves Studio City homeowners directly and coordinates projects across the adjacent metro core: West Hollywood, CA to the south, Sherman Oaks, CA to the north in the flat Valley, Beverly Hills, CA to the southwest, and Culver City, CA to the west. Each city carries its own ADU ordinance nuances and LADBS or local plan-check requirements that we navigate as part of the standard permit set.

Serving Studio City, CA - Our Local Coverage Area

We’re serving the Studio City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Studio City

Ready to get started? Free estimates in Studio City
Call (213) 698-7591

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Studio City Customers Say

★★★★★ 4.7 from 7+ reviews

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

How It Works in Studio City

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A small deck outside a new ADUA former garage converted into a guest houseThe sitting area and efficiency kitchen of a junior ADUThe living room inside a new ADUA bedroom and desk inside a converted garageThe bathroom inside a new ADU

More ADU services in Studio City

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in Westchester

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Westchester team

A local vetted partner works across Westchester and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Studio City. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch